| 1. |
According to common industry scale, what does detection ranking (D) 1 indicate? |
| A. | Can t be determined |
| B. | Uncertainty in detection |
| C. | The value doesn t exist |
| D. | Certainly detectable |
| Answer» E. | |
| 2. |
According to common industry scale, what does occurrence ranking (O) 1 indicate? |
| A. | Not likely |
| B. | Highly likely |
| C. | Certain to happen |
| D. | The value doesn t exist |
| Answer» B. Highly likely | |
| 3. |
According to common industry scale, what does severity ranking (S) 1 indicate? |
| A. | Very serious effect |
| B. | No effect |
| C. | Sometimes serious effect |
| D. | The value doesn t exist |
| Answer» C. Sometimes serious effect | |
| 4. |
A particular product has been given the following rankings for calculating RPN while preparing FMEA chart, S=10, O=2, D=2. What is the value of RPN? |
| A. | 20 |
| B. | 10 |
| C. | 40 |
| D. | 2 |
| Answer» D. 2 | |
| 5. |
Which of the following is not a benefit of FMEA? |
| A. | Increase in customer satisfaction |
| B. | Prioritize product/process deficiencies |
| C. | Maximize late changes and associated cost |
| D. | Document and track actions taken to reduce risk |
| Answer» D. Document and track actions taken to reduce risk | |
| 6. |
Find the odd one out related to the data inputs required to prepare FMEA. |
| A. | Product and process specifications |
| B. | Reliability data |
| C. | Customer priority data |
| D. | Quality engineer |
| Answer» E. | |
| 7. |
Find the odd one out related to the FMEA team. |
| A. | Assembly engineer |
| B. | Manufacturing engineer |
| C. | Quality engineer |
| D. | Process variability data |
| Answer» E. | |
| 8. |
The analysis of potential failures of product or service due to component or subsystem unreliability is involved in design FMEA. |
| A. | True |
| B. | False |
| Answer» B. False | |
| 9. |
What is RPN? |
| A. | Risk Potential Number |
| B. | Risk Priority Number |
| C. | Risk Preference number |
| D. | Risk Preventive Number |
| Answer» C. Risk Preference number | |
| 10. |
To anticipate failures and prevent them from happening is the objective of FMEA. |
| A. | True |
| B. | False |
| Answer» B. False | |
| 11. |
What does FMEA stand for? |
| A. | Failure Modes and Effects Analysis |
| B. | Failure Modes and Effective Analysis |
| C. | Failure Modes and Affective Analysis |
| D. | Failure Modes and Efficient Analysis |
| Answer» B. Failure Modes and Effective Analysis | |