1.

…………………..is the earliest time an activity can begin

A. eft
B. lst
C. lft
D. est
Answer» E.
2.

Activities that can be accomplished simultaneously are called……………activities.

A. critical
B. preceding
C. succeeding
D. concurrent
Answer» E.
3.

Activities that cannot be started until one or more of other activities arecompleted but immediately follow are called…………………..

A. critical
B. preceding
C. succeeding
D. concurrent
Answer» D. concurrent
4.

……………are activities that must be completed immediately prior to the start ofanother activity.

A. critical
B. preceding
C. succeeding
D. concurrent
Answer» C. succeeding
5.

Activities lying on the critical path are known as……………………..activities.

A. critical
B. preceding
C. succeeding
D. concurrent
Answer» B. preceding
6.

Critical path is the longest ………………………….in the network

A. slack
B. activity
C. event
D. path
Answer» E.
7.

……is the unbroken chain of activities from start event to end event in thenetwork diagram.

A. slack
B. activity
C. network
D. path
Answer» E.
8.

Node represents…………………………

A. slack
B. activity
C. network
D. event
Answer» E.
9.

…………………….represents the start and end of an activity.

A. event
B. activity
C. network
D. slack
Answer» B. activity
10.

The element of job to be completed in a specific time is known as……………………….

A. event
B. activity
C. network
D. slack
Answer» C. network
11.

……………………….represents the activities and events of a project in a logicalsequence.

A. network diagram
B. project graph
C. arrow diagram
D. all of these
Answer» B. project graph
12.

………………………analysis is a technique commonly used to assess expected productprofitability.

A. pert
B. cpm
C. bep
D. swot
Answer» D. swot
13.

A series of related activities which result in some product or service is called……

A. event
B. task
C. network
D. slack
Answer» D. slack
14.

………………………… is a network technique of scheduling and controlling theproject where activity times cannot be precisely estimated.

A. pert
B. cpm
C. bep
D. swot
Answer» B. cpm
15.

……………………….. is the difference between sales and variable cost.

A. margin of safety
B. fixed cost
C. contribution
D. profit
Answer» D. profit
16.

……………………….. Analysis is one of the most popular techniques used forplanning, scheduling, monitoring and co-ordinating projects comprising a number of activities.

A. network
B. financial
C. techno-economic
D. input
Answer» B. financial
17.

The term ……………………………… refers to the plan for a particular type of building,arrangement of machinery and equipment and provision of facilitation in the building.

A. factory building
B. factory design
C. factory layout
D. factory premises
Answer» C. factory layout
18.

……………………………… technology refers to that technology which is suitable tolocal, economic, social and cultural conditions.

A. indigenous
B. imported
C. advanced
D. appropriate
Answer» E.
19.

………………………………. Analysis is primarily concerned with the identification,quantification and evaluation of project resources.

A. network
B. financial
C. techno-economic
D. input
Answer» E.
20.

………………………………analysis is done to ascertain financial viability of a project.

A. network
B. financial
C. techno-economic
D. input
Answer» C. techno-economic
21.

Project formulation means ……………………………….. Study.

A. profitability
B. liquidity
C. feasibility
D. viability
Answer» D. viability
22.

SWOT stands for strength, weakness, opportunity, and ………………………………..

A. treat
B. threat
C. tort
D. none
Answer» C. tort
23.

After screening the ideas, they are translated into project………………………………….

A. portfolio
B. profiles
C. proposal
D. none
Answer» C. proposal
24.

The process of evaluating the project ideas with a view to select the best and promising idea after eliminating the unprofitable ideas is called………………………..Of the project ideas.

A. screening
B. appraisal
C. identification
D. none
Answer» B. appraisal
25.

………………………………. the process of collection, compilation and analysis of economic data for the purpose of finding out possible opportunities forinvestment.

A. project screening
B. project appraisal
C. project identification
D. none
Answer» D. none
26.

………………refers to any investment opportunity which is to be exploited for profit.

A. product
B. project
C. share
D. none of these
Answer» C. share
27.

The Head Office of KINFRA is located at………………………

A. thiruvananthapuram
B. kozhikode
C. ernakulum
D. kannur
Answer» B. kozhikode
28.

Which of these is not a state level promotional institutions

A. kitco
B. ksidc
C. niesbud
D. sidco
Answer» D. sidco
29.

…………………… is an area where applied research on high tech projects isconducted

A. step
B. swot
C. epst
D. none of these
Answer» B. swot
30.

…………………… provides consultancy services to small and medium enterprises atreasonable cost

A. naye
B. tco
C. sido
D. nsic
Answer» C. sido
31.

KITCO was established in ………………

A. 1970
B. 1973
C. 1972
D. 1975
Answer» D. 1975
32.

……………. Is a National level apex organization of young entrepreneurs

A. naye
B. tco
C. sido
D. nsic
Answer» B. tco
33.

Techno crafts is assistance is provided by………………………..

A. kfc
B. kitco
C. ksidc
D. kinfra
Answer» B. kitco
34.

KINFRA was setup in …………………….

A. 2000
B. 1993
C. 1996
D. 1999
Answer» C. 1996
35.

Offering single window clearance facility is the most fascinating feature of ………

A. ksidc
B. kitco
C. dic
D. kinfra
Answer» D. kinfra
36.

The advance given to cover the finance requirement during the time lag betweenthe sanctioning and disbursement of term loan by financial institutions is known as…………..

A. soft loan.
B. seed capital.
C. capital subsidy.
D. bridge loan.
Answer» E.
37.

The MSME Development Act came into force in the year……………………………….

A. 2005.
B. 2006.
C. 2007.
D. none of these.
Answer» C. 2007.
38.

Single window scheme is instituted through…………………………

A. idbi.
B. sidco.
C. kfc.
D. dic.
Answer» E.
39.

A bonus or financial aid which is given by a govt. to an industry to help itcompete with other units in home market or in a foreign market is known as……

A. subsidy.
B. concession.
C. bounties.
D. none of these.
Answer» D. none of these.
40.

The investment in plant and machinery in ancillary units should not exceed………

A. rs.25 lakhs.
B. 2 crores.
C. 5 crores.
D. 10 crores.
Answer» D. 10 crores.
41.

A single lump sum which is given by a govt. to an entrepreneur to cover the costis known as…….

A. subsidy.
B. concession.
C. bounties.
D. none of these.
Answer» B. concession.
42.

A small service enterprise is one in which the investment in plant and machinerydoes not exceed…………………….

A. rs. 25 lakhs.
B. 1 crore.
C. 2 crores.
D. none of these.
Answer» D. none of these.
43.

A micro service is one in which the investment in plant and machinery does notexceed………..

A. rs. 5 lakhs.
B. rs.10 lakhs.
C. rs 25 lakhs.
D. none of these.
Answer» C. rs 25 lakhs.
44.

A micro manufacturing enterprise is one in which the investment in plant andmachinery does not exceed…………………….

A. rs. 5 lakhs.
B. rs. 10 lakhs.
C. rs.20 lakhs.
D. none of these.
Answer» E.
45.

……………………… offers comprehensive consultancy services to MSMEs in Kerala.

A. ksidc
B. kitco
C. dic
D. kinfra
Answer» C. dic
46.

KITCO was set up in………………………

A. 1973
B. 1971
C. 1972
D. 1970
Answer» D. 1970
47.

Under the single roof of the ………………………all the services and support requiredby small and village entrepreneurs are provided.

A. ksidc
B. kitco
C. dic
D. kinfra
Answer» D. kinfra
48.

The initial capital that is required to obtain loans from the financial institutionsis called ……………

A. seed capital
B. incentive
C. subsidy
D. none of these
Answer» B. incentive
49.

………………………………….is the place where the required facilities and factoryaccommodation are provided by the government to the entrepreneurs to establish their industries there.

A. industry
B. industrial estate
C. company
D. none of these
Answer» C. company
50.

………………………………. Is the financial and promotional assistance provided by the Govt. to the industries for boosting up industrial development in all regionsparticularly in backward areas.

A. seed capital
B. incentive
C. subsidy
D. none of these
Answer» C. subsidy