1. |
After a drawing has been released, an engineering change order is used to document and approve drawing changes. |
A. | 1 |
B. | |
Answer» B. | |
2. |
It is important to establish a procedure and name files systematically. |
A. | 1 |
B. | |
Answer» B. | |
3. |
Individual companies often have their own standards of data management. |
A. | 1 |
B. | |
Answer» B. | |
4. |
Legal standards for how long engineering drawings need to be retained are standardized in the United States. |
A. | 1 |
B. | |
Answer» C. | |
5. |
Quality standards in some industries allow for electronic documents to serve as a permanent record if they are properly controlled. |
A. | 1 |
B. | |
Answer» B. | |
6. |
Electronic files for the most part have replaced the use of microfilm and microfiche. |
A. | 1 |
B. | |
Answer» B. | |
7. |
Efficient document management is only a minor part of effective concurrent engineering practices. |
A. | 1 |
B. | |
Answer» C. | |
8. |
It is a good idea to have a single directory in which all employees store work. |
A. | 1 |
B. | |
Answer» C. | |
9. |
Design databases can be used to streamline the design process. |
A. | 1 |
B. | |
C. | 1 |
D. | |
Answer» B. | |
10. |
Because electronically stored files can easily be altered, they may not be considered acceptable for documentation. |
A. | 1 |
B. | |
Answer» B. | |
11. |
Design milestones and reviews help ensure that the design process is timely. |
A. | 1 |
B. | |
C. | 1 |
D. | |
Answer» B. | |
12. |
PERT or Gantt charts are used specifically to track time engineering change orders. |
A. | 1 |
B. | |
Answer» C. | |
13. |
Drawings created with commercial software are typically saved as: |
A. | Rapid prototypes |
B. | Electronic files |
C. | Draft drawings |
D. | Change orders |
Answer» C. Draft drawings | |
14. |
Once a drawing is determined to be complete, the title block is used to document the change from: |
A. | A draft to a finished drawing |
B. | A finished to a working drawing |
C. | An assembly to a finished drawing |
D. | A working drawing to a draft |
Answer» B. A finished to a working drawing | |
15. |
If designs require changes, they should be documented with: |
A. | Development plans |
B. | Product proposals |
C. | Document reviews |
D. | Engineering change orders |
Answer» E. | |
16. |
To be useful, drawings must be stored electronically in a manner that satisfies the requirements for a static snapshot of the design at the time of release. |
A. | 1 |
B. | |
C. | 1 |
D. | |
Answer» B. | |
17. |
Using this as a communication and design review tool can help shorten the process and eliminate productivity barriers: |
A. | Development plans |
B. | Portable document files |
C. | The Internet and e-mail |
D. | Gantt charts |
Answer» D. Gantt charts | |