 
			 
			MCQOPTIONS
 Saved Bookmarks
				This section includes 19 Mcqs, each offering curated multiple-choice questions to sharpen your Highway Engineering knowledge and support exam preparation. Choose a topic below to get started.
| 1. | The failure in settlement takes place due to the settlement of __________ | 
| A. | Fill | 
| B. | Sub grade | 
| C. | Fill and Sub grade | 
| D. | Embankment | 
| Answer» D. Embankment | |
| 2. | The distress in bituminous pavement due to ineffective drainage system develops during __________ | 
| A. | Summer | 
| B. | Winter | 
| C. | Rainy | 
| D. | Spring | 
| Answer» D. Spring | |
| 3. | The failure of the pavement which is not dependent on the design is __________ | 
| A. | Inferior materials | 
| B. | Delay of compaction | 
| C. | Settlement | 
| D. | Overloaded vehicles | 
| Answer» E. | |
| 4. | The rate of growth of the deterioration is __________ | 
| A. | Linear | 
| B. | Parabolic | 
| C. | Exponential | 
| D. | Cubical | 
| Answer» D. Cubical | |
| 5. | The maintenance operations do not involve __________ | 
| A. | Survey work | 
| B. | Assessment of road condition | 
| C. | Diagnosis | 
| D. | Adopting the most appropriate steps | 
| Answer» B. Assessment of road condition | |
| 6. | The inadequate compaction of sub grade may lead to distress in __________ | 
| A. | Flexible pavements | 
| B. | Rigid pavements | 
| C. | Both flexible and rigid | 
| D. | WBM roads | 
| Answer» D. WBM roads | |
| 7. | The deterioration left unnoticed will lead to __________ | 
| A. | Increase of cost | 
| B. | Increase of life span | 
| C. | Increase of initial cost | 
| D. | Decrease of material | 
| Answer» B. Increase of life span | |
| 8. | The blockade of the longitudinal and cross drains leads to __________ | 
| A. | Increase of water | 
| B. | Decrease of ground water | 
| C. | Stagnation | 
| D. | Floods | 
| Answer» D. Floods | |
| 9. | The damage can be caused to a well designed pavement in a hot region is by __________ | 
| A. | Rain | 
| B. | Heat | 
| C. | Snow | 
| D. | Traffic | 
| Answer» B. Heat | |
| 10. | THE_DISTRESS_IN_BITUMINOUS_PAVEMENT_DUE_TO_INEFFECTIVE_DRAINAGE_SYSTEM_DEVELOPS_DURING.?$ | 
| A. | Summer | 
| B. | Winter | 
| C. | Rainy | 
| D. | Spring | 
| Answer» D. Spring | |
| 11. | The_failure_in_settlement_takes_place_due_to_the_settlement_of.$ | 
| A. | Fill | 
| B. | Sub grade | 
| C. | Both | 
| D. | Embankment | 
| Answer» D. Embankment | |
| 12. | The failure of the pavement which is not dependent on the design is? | 
| A. | Inferior materials | 
| B. | Delay of compaction | 
| C. | Settlement | 
| D. | Overloaded vehicles | 
| Answer» E. | |
| 13. | The rate of growth of the deterioration is. | 
| A. | Linear | 
| B. | Parabolic | 
| C. | Exponential | 
| D. | Cubical | 
| Answer» D. Cubical | |
| 14. | The maintenance operations do not involve. | 
| A. | Survey work | 
| B. | Assessment of road condition | 
| C. | Diagnosis | 
| D. | Adopting the most appropriate steps | 
| Answer» B. Assessment of road condition | |
| 15. | Which of the following is a cause of distress in rigid pavement only? | 
| A. | Inadequate compaction | 
| B. | Inadequate drainage | 
| C. | Dowel bars | 
| D. | Defect in materials | 
| Answer» D. Defect in materials | |
| 16. | The inadequate compaction of sub grade may lead to distress in. | 
| A. | Flexible pavements | 
| B. | Rigid pavements | 
| C. | Both flexible and rigid | 
| D. | WBM roads | 
| Answer» D. WBM roads | |
| 17. | The deterioration left unnoticed will lead to. | 
| A. | Increase of cost | 
| B. | Increase of life span | 
| C. | Increase of initial cost | 
| D. | Decrease of material | 
| Answer» B. Increase of life span | |
| 18. | The blockade of the longitudinal and cross drains leads to. | 
| A. | Increase of water | 
| B. | Decrease of ground water | 
| C. | Stagnation | 
| D. | Floods | 
| Answer» D. Floods | |
| 19. | The damage can be caused to a well designed pavement in a hot region is by. | 
| A. | Rain | 
| B. | Heat | 
| C. | Snow | 
| D. | Traffic | 
| Answer» B. Heat | |