1.

If the spans are large, they can be sub divided by means of ____________

A. Struts
B. Piers
C. Ridges
D. Walls
Answer» C. Ridges
2.

The construction procedure must be planned using ____________

A. Sequential computations
B. Reverse computations
C. Complicated computations
D. Aligned computations
Answer» B. Reverse computations
3.

What is the main feature of this method comprises a moveable temporary arrangement to limit?

A. Feasible stress
B. Cantilever stress
C. Rigidity stress
D. Bond stress
Answer» C. Rigidity stress
4.

The construction starts at one end of the structure and proceeds continuously to the other end is?

A. Progressive placement method
B. Transverse placement method
C. Horizontal placement method
D. Linear placement method
Answer» B. Transverse placement method
5.

In push out technique each unit in cast directly against the ____________

A. Previous unit
B. Tensile unit
C. Last units
D. Progressive units
Answer» B. Tensile unit
6.

The cantilever method has been successfully used in the span range of ____________

A. 40-150
B. 30-150
C. 50-200
D. 40-200
Answer» D. 40-200
7.

In the cost insitu method the least time required to move formwork is?

A. 7
B. 8
C. 3
D. 2
Answer» B. 8
8.

The main advantage of using precast segmental units is they can be cast on ____________

A. Beam
B. Slab
C. Edges
D. Ground
Answer» E.
9.

One of the example of cast insitu construction.

A. Boussens bridge, France
B. Larens bridge, Uganda
C. Lithcher bridge, Spain
D. Rouli bridge, Africa
Answer» B. Larens bridge, Uganda
10.

In cat insitu construction the formwork is supported by ____________

A. Aluminium frame work
B. Wood frame work
C. Steel frame work
D. Cloth formwork
Answer» D. Cloth formwork
11.

The major methods of cantilever construction are classified into how many types?

A. 2 tyres
B. 3 types
C. 4 types
D. 6 types
Answer» B. 3 types
12.

Cantilever construction eliminates the use of ____________

A. Steel
B. Cement
C. Formwork
D. Workman
Answer» D. Workman
13.

IN_PUSH_OUT_TECHNIQUE_EACH_UNIT_IN_CAST_DIRECTLY_AGAINST_THE:?$

A. Previous unit
B. Tensile unit
C. Last units
D. Progressive units
Answer» B. Tensile unit
14.

The main feature of this method comprises a moveable temporary arrangement to limit the:$

A. Feasible stress
B. Cantilever stress
C. Rigidity stress
D. Bond stress
Answer» C. Rigidity stress
15.

The construction starts at one end of the structure and proceeds continuously to other end is:$

A. Progressive placement method
B. Transverse placement method
C. Horizontal placement method
D. Linear placement method
Answer» B. Transverse placement method
16.

If the spans are large, they can be sub divided by means of:

A. Struts
B. Piers
C. Ridges
D. Walls
Answer» C. Ridges
17.

In incremental launching or pull out technique to allow the super structure to move forward, what are provided?

A. Sliding bearings
B. Rolling bearings
C. Strut bearings
D. Tensile bearings
Answer» B. Rolling bearings
18.

The construction procedure must be planned using:

A. Sequential computations
B. Reverse computations
C. Complicated computations
D. Aligned computations
Answer» B. Reverse computations
19.

Which type of construction is particularly advantageous in long via duct structures, a segmental?

A. Span to span
B. Edge to edge
C. Column to column
D. Beam to beam
Answer» B. Edge to edge
20.

Which one of the following method of construction is adopted when low clearance is required below the deck?

A. Erection method
B. Stagging method
C. Elongation method
D. Longitudinal method
Answer» C. Elongation method
21.

The cantilever method has been successfully used in the span range of:

A. 40-150
B. 30-150
C. 50-200
D. 40-200
Answer» D. 40-200
22.

In the cost insitu method the least time required to move formwork is:

A. 7
B. 8
C. 3
D. 2
Answer» B. 8
23.

The main advantage of using precast segmental units is they can be cast on:

A. Beam
B. Slab
C. Edges
D. Ground
Answer» E.
24.

One of the example of cast insitu construction:

A. Boussens bridge, France
B. Larens bridge, Uganda
C. Lithcher bridge, Spain
D. Rouli bridge, Africa
Answer» B. Larens bridge, Uganda
25.

In cat insitu construction the formwork is supported by:

A. Aluminium frame work
B. Wood frame work
C. Steel frame work
D. Cloth formwork
Answer» D. Cloth formwork
26.

The major methods of cantilever construction are classified into how many types:

A. 2 tyres
B. 3 types
C. 4 types
D. 6 types
Answer» B. 3 types
27.

Cantilever construction eliminates the use of:

A. Steel
B. Cement
C. Formwork
D. Workman
Answer» D. Workman