MCQOPTIONS
Bookmark
Saved Bookmarks
→
Prestressed Concrete Structures
→
Transmission Length in Prestressed Concrete Structures
→
If the spans are large, they can be sub divided b..
1.
If the spans are large, they can be sub divided by means of ____________
A.
Struts
B.
Piers
C.
Ridges
D.
Walls
Answer» C. Ridges
Show Answer
Discussion
No Comment Found
Post Comment
Related MCQs
If the spans are large, they can be sub divided by means of ____________
The construction procedure must be planned using ____________
What is the main feature of this method comprises a moveable temporary arrangement to limit?
The construction starts at one end of the structure and proceeds continuously to the other end is?
In push out technique each unit in cast directly against the ____________
The cantilever method has been successfully used in the span range of ____________
In the cost insitu method the least time required to move formwork is?
The main advantage of using precast segmental units is they can be cast on ____________
One of the example of cast insitu construction.
In cat insitu construction the formwork is supported by ____________
Reply to Comment
×
Name
*
Email
*
Comment
*
Submit Reply