MCQOPTIONS
Saved Bookmarks
| 1. |
Which one of the following method of construction is adopted when low clearance is required below the deck? |
| A. | Erection method |
| B. | Stagging method |
| C. | Elongation method |
| D. | Longitudinal method |
| Answer» C. Elongation method | |