				This section includes 27 Mcqs, each offering curated multiple-choice questions to sharpen your Prestressed Concrete Structures knowledge and support exam preparation. Choose a topic below to get started.
| 1. | If the spans are large, they can be sub divided by means of ____________ | 
| A. | Struts | 
| B. | Piers | 
| C. | Ridges | 
| D. | Walls | 
| Answer» C. Ridges | |
| 2. | The construction procedure must be planned using ____________ | 
| A. | Sequential computations | 
| B. | Reverse computations | 
| C. | Complicated computations | 
| D. | Aligned computations | 
| Answer» B. Reverse computations | |
| 3. | What is the main feature of this method comprises a moveable temporary arrangement to limit? | 
| A. | Feasible stress | 
| B. | Cantilever stress | 
| C. | Rigidity stress | 
| D. | Bond stress | 
| Answer» C. Rigidity stress | |
| 4. | The construction starts at one end of the structure and proceeds continuously to the other end is? | 
| A. | Progressive placement method | 
| B. | Transverse placement method | 
| C. | Horizontal placement method | 
| D. | Linear placement method | 
| Answer» B. Transverse placement method | |
| 5. | In push out technique each unit in cast directly against the ____________ | 
| A. | Previous unit | 
| B. | Tensile unit | 
| C. | Last units | 
| D. | Progressive units | 
| Answer» B. Tensile unit | |
| 6. | The cantilever method has been successfully used in the span range of ____________ | 
| A. | 40-150 | 
| B. | 30-150 | 
| C. | 50-200 | 
| D. | 40-200 | 
| Answer» D. 40-200 | |
| 7. | In the cost insitu method the least time required to move formwork is? | 
| A. | 7 | 
| B. | 8 | 
| C. | 3 | 
| D. | 2 | 
| Answer» B. 8 | |
| 8. | The main advantage of using precast segmental units is they can be cast on ____________ | 
| A. | Beam | 
| B. | Slab | 
| C. | Edges | 
| D. | Ground | 
| Answer» E. | |
| 9. | One of the example of cast insitu construction. | 
| A. | Boussens bridge, France | 
| B. | Larens bridge, Uganda | 
| C. | Lithcher bridge, Spain | 
| D. | Rouli bridge, Africa | 
| Answer» B. Larens bridge, Uganda | |
| 10. | In cat insitu construction the formwork is supported by ____________ | 
| A. | Aluminium frame work | 
| B. | Wood frame work | 
| C. | Steel frame work | 
| D. | Cloth formwork | 
| Answer» D. Cloth formwork | |
| 11. | The major methods of cantilever construction are classified into how many types? | 
| A. | 2 tyres | 
| B. | 3 types | 
| C. | 4 types | 
| D. | 6 types | 
| Answer» B. 3 types | |
| 12. | Cantilever construction eliminates the use of ____________ | 
| A. | Steel | 
| B. | Cement | 
| C. | Formwork | 
| D. | Workman | 
| Answer» D. Workman | |
| 13. | IN_PUSH_OUT_TECHNIQUE_EACH_UNIT_IN_CAST_DIRECTLY_AGAINST_THE:?$ | 
| A. | Previous unit | 
| B. | Tensile unit | 
| C. | Last units | 
| D. | Progressive units | 
| Answer» B. Tensile unit | |
| 14. | The main feature of this method comprises a moveable temporary arrangement to limit the:$ | 
| A. | Feasible stress | 
| B. | Cantilever stress | 
| C. | Rigidity stress | 
| D. | Bond stress | 
| Answer» C. Rigidity stress | |
| 15. | The construction starts at one end of the structure and proceeds continuously to other end is:$ | 
| A. | Progressive placement method | 
| B. | Transverse placement method | 
| C. | Horizontal placement method | 
| D. | Linear placement method | 
| Answer» B. Transverse placement method | |
| 16. | If the spans are large, they can be sub divided by means of: | 
| A. | Struts | 
| B. | Piers | 
| C. | Ridges | 
| D. | Walls | 
| Answer» C. Ridges | |
| 17. | In incremental launching or pull out technique to allow the super structure to move forward, what are provided? | 
| A. | Sliding bearings | 
| B. | Rolling bearings | 
| C. | Strut bearings | 
| D. | Tensile bearings | 
| Answer» B. Rolling bearings | |
| 18. | The construction procedure must be planned using: | 
| A. | Sequential computations | 
| B. | Reverse computations | 
| C. | Complicated computations | 
| D. | Aligned computations | 
| Answer» B. Reverse computations | |
| 19. | Which type of construction is particularly advantageous in long via duct structures, a segmental? | 
| A. | Span to span | 
| B. | Edge to edge | 
| C. | Column to column | 
| D. | Beam to beam | 
| Answer» B. Edge to edge | |
| 20. | Which one of the following method of construction is adopted when low clearance is required below the deck? | 
| A. | Erection method | 
| B. | Stagging method | 
| C. | Elongation method | 
| D. | Longitudinal method | 
| Answer» C. Elongation method | |
| 21. | The cantilever method has been successfully used in the span range of: | 
| A. | 40-150 | 
| B. | 30-150 | 
| C. | 50-200 | 
| D. | 40-200 | 
| Answer» D. 40-200 | |
| 22. | In the cost insitu method the least time required to move formwork is: | 
| A. | 7 | 
| B. | 8 | 
| C. | 3 | 
| D. | 2 | 
| Answer» B. 8 | |
| 23. | The main advantage of using precast segmental units is they can be cast on: | 
| A. | Beam | 
| B. | Slab | 
| C. | Edges | 
| D. | Ground | 
| Answer» E. | |
| 24. | One of the example of cast insitu construction: | 
| A. | Boussens bridge, France | 
| B. | Larens bridge, Uganda | 
| C. | Lithcher bridge, Spain | 
| D. | Rouli bridge, Africa | 
| Answer» B. Larens bridge, Uganda | |
| 25. | In cat insitu construction the formwork is supported by: | 
| A. | Aluminium frame work | 
| B. | Wood frame work | 
| C. | Steel frame work | 
| D. | Cloth formwork | 
| Answer» D. Cloth formwork | |
| 26. | The major methods of cantilever construction are classified into how many types: | 
| A. | 2 tyres | 
| B. | 3 types | 
| C. | 4 types | 
| D. | 6 types | 
| Answer» B. 3 types | |
| 27. | Cantilever construction eliminates the use of: | 
| A. | Steel | 
| B. | Cement | 
| C. | Formwork | 
| D. | Workman | 
| Answer» D. Workman | |