101.

EOQ stands for

A. Equal order quantity
B. Economic order quantity
C. Extra order quantity
D. None of the above
Answer» C. Extra order quantity
102.

Negative attitude can be controlled by

A. Religion
B. Values
C. Introduction of strict disciplined environment
D. None of the above
Answer» C. Introduction of strict disciplined environment
103.

Employees having their age more than..............years can become the members of the union.

A. 18
B. 15
C. 21
D. 25
Answer» C. 21
104.

In which of the following stages practicability of project is ensured?

A. Planning stage
B. Briefing stage
C. Construction stage
D. None of the above
Answer» C. Construction stage
105.

Which organization permits quick decision?

A. Matrix organization
B. Line or military organization
C. Line and staff organization
D. none
Answer» C. Line and staff organization
106.

Economic cost is the only reason for which a contractor should be conscious of constructionsafety.

A. TRUE
B. FALSE
C. none
D. all
Answer» C. none
107.

Specialized work needs departmental execution

A. Right
B. Wrong
C. none
D. all
Answer» C. none
108.

In which of the following contract; contractor tries to complete job quickly?

A. Item rate contract
B. Cost plus fixed fee contract
C. All in one contract
D. Labour contract
Answer» C. All in one contract
109.

Which of the following contract is most suitable for road and bridges?

A. BOT contract
B. Cost plus fixed fee contract
C. All in one contract
D. Labour contract
Answer» B. Cost plus fixed fee contract
110.

Which of the following is an activity

A. Excavation
B. Curing
C. Laying concrete
D. All of the above
Answer» E.
111.

The space between the walls and cement bags all-round should be at least......... cms.

A. 30
B. 50
C. 60
D. 40
Answer» B. 50
112.

Total no of grades for registration of contractor with governments are

A. 3
B. 5
C. 7
D. 4
Answer» D. 4
113.

In case of cantilever beam, reinforcement must be placed at the ....... of the member.

A. Top
B. Bottom
C. Sides
D. None of the above
Answer» B. Bottom
114.

Before starting piling work, a complete knowledge of underground structures (such as sewers,water pipeline, gas mains etc.) is essential.

A. Agree
B. Disagree
C. none
D. all
Answer» B. Disagree
115.

The major principle of an organization is

A. span of management
B. unity of command
C. delegation of authority
D. all of these
Answer» E.
116.

Leave encashment is

A. Direct financial incentive
B. Non financial incentive
C. Indirect financial incentive
D. None of the above
Answer» D. None of the above
117.

In sheds for ceiling works, ......................... scaffolding is economical.

A. Suspended
B. Needle
C. Ordinary
D. None of the above
Answer» B. Needle
118.

What is the simplest and oldest type of organization?

A. Matrix organization
B. Line or military organization
C. Line and staff organization
D. Functional organization
Answer» C. Line and staff organization
119.

................is provided to safeguard scaffolding against overturning.

A. Standards
B. Inclined rackers
C. Put-logs
D. Rails
Answer» C. Put-logs
120.

Heavy equipment, such as excavating machinery, trucks, dumpers, etc. should be kept away from the excavated sides at a distance not less than the depth of trench

A. Agree
B. Disagree
C. none
D. all
Answer» B. Disagree
121.

The critical path is

A. The longest path of the network
B. The shortest path of the network
C. The average duration path of the network
D. None of the above
Answer» B. The shortest path of the network
122.

Person selects information that suits his

A. Religion
B. Values
C. Embitions
D. Environment
Answer» C. Embitions
123.

Which of the following cause of an accident can be attributed to organization?

A. Use of unsuitable material
B. Defective supervision of work
C. Unsuitable equipment
D. Unskilled operators
Answer» C. Unsuitable equipment
124.

Which of the following are the qualities of good construction manager?

A. Good character.
B. Integrity to enhance teamwork.
C. Devotion to duty.
D. All of the above
Answer» E.
125.

The construction industry has accounted for about .........% of all occupational injuries

A. 20
B. 25
C. 11
D. 5
Answer» D. 5
126.

The main function of the construction management is

A. Organizing
B. Directing
C. Planning
D. All of the above
Answer» E.
127.

Whenever workmen have to excavate in trenches in soil, soft rock or hard soil exceeding ............. m in depth, the trenches should be securely shored and timbered.

A. 2
B. 1.5
C. 3
D. 2.1
Answer» B. 1.5
128.

..................... is a function of values and perception of a person

A. Success
B. Relation
C. Attitude
D. Nature
Answer» D. Nature
129.

In which of the following organization expert advice is available?

A. Matrix organization
B. Line or military organization
C. Line and staff organization
D. Functional organization
Answer» D. Functional organization
130.

In a functional organization

A. quality of work is better
B. specialized knowledge and guidance to individual worker is provided
C. wastage of material is minimum
D. all of the above
Answer» E.
131.

Pile drivers should be kept near electricity line to get electricity

A. Agree
B. Disagree
C. none
D. all
Answer» C. none
132.

The stack height for bricks should not be more than .......... m.

A. 1.2
B. 1.5
C. 1.75
D. 2.0
Answer» C. 1.75
133.

Formal reports are information system used by

A. Head of department
B. Top management
C. Supervisor,foreman,clerk
D. None of the above
Answer» D. None of the above
134.

Earliest start time of activity equals to

A. TE of tail event of an activity
B. TE of head event of an activity
C. Average time of TE of tail event and head event
D. None of the above
Answer» B. TE of head event of an activity
135.

The difference between the total float and free float is called

A. Duration
B. Interfering float
C. Critical activity
D. None of the above
Answer» C. Critical activity
136.

What is Span of management?

A. It is the number of persons to be supervised by a manager
B. It is the number of years for management to remain active
C. It is the average age of manager in a business
D. It is the number of achievements of management
Answer» B. It is the number of years for management to remain active
137.

While placing of concrete, it should not be dropped from more than .......m height.

A. 2
B. 1
C. 3
D. 4
Answer» C. 3
138.

Which one of the following is not a system of HRD

A. Optimization of resources system
B. Appraisal system
C. Carrier system
D. Training System
Answer» B. Appraisal system
139.

F.W. Taylor introduced a system of organization known as

A. line and staff organization
B. line organization
C. functional organization
D. none of these
Answer» D. none of these
140.

HRD stands for

A. Human resource development
B. Human resource design
C. Higher resource development
D. None of the above
Answer» B. Human resource design
141.

Assertion A: For a given depth of cut, the output of a power shovel can be increased by decreasing the angle of swing.Reason R: If the angle of swing is decreased, the cycle time will be decreased. Select the correct answer.

A. Both A and R is true and R is the correct explanation of A
B. Both A and R is true but R is not the correct explanation ofA
C. A is true but R is false
D. A is false but R is true
Answer» B. Both A and R is true but R is not the correct explanation ofA
142.

The part of a derrick crane include(i) Mast (ii) Boom (iii) Bull wheel (iv) Jack Of these statements

A. (i), (ii) and (iv) are correct
B. (ii), (iii) and (iv) are correct
C. (i), (iii) and (iv) are correct
D. (i), (ii) and (iii) are correct
Answer» E.
143.

The rated loads of lifting cranes, as percentage of tipping load at specified radius, for crawlermounted and pneumatic tyre-mounted machines would be respectively

A. 80 and 90
B. 90 and 80
C. 85 and 75
D. 75 and 83
Answer» E.
144.

Assertion (A): Activity 57 is critical.Reason (R): Earliest finish time and latest finish time for events 57 are same Select the correct answer.

A. A is correct but R is not correct
B. R is correct but A is not correct
C. Both A and R is correct
D. Both A and R is incorrect
Answer» B. R is correct but A is not correct
145.

Consider the following features/factors:1. Projects are of the non-repetitive type 2. Time required need not be known 3. Time required is known precisely 4. Events have been established for planning 5. Emphasis is given to activities ofproject PERT is preferred for planning becauseof

A. 1, 2 and 4
B. 3, 4 and 5
C. 1, 3 and 4
D. 1, 2 and 5
Answer» B. 3, 4 and 5
146.

A wheeled tractor hauling unit is working on firm earth. The total loaded weight distribution ofthis unit is: Drive wheels: 25000 kg Scraper wheels: 10000 kg If the coefficient of traction for wheeled tractor on firm earth is 0.5, the rimpull which this tractor can exert without slipping is

A. 10000 kg
B. 12500 kg
C. 22500 kg
D. 5000 kg
Answer» C. 22500 kg
147.

For a given activity, the optimistic time, pessimistic time and the most probable estimates are 5,17 and 8 days respectively, The expected time is

A. 8 days
B. 9 days
C. 10 days
D. 15 days
Answer» C. 10 days
148.

The time which results in the leasi, possible construction cost of an activity, is known as

A. Normal time
B. Slow time
C. Crash time
D. Standard time
Answer» C. Crash time
149.

If D is the duration, ES and EF are the earliest start and finish, LS and LF are latest start and latestfinish time, then the following relation holds good

A. EF = ES + D
B. LS = LF - D
C. LF = LS + D
D. All the above
Answer» E.
150.

Output of a bulldozeris(i) Increased if drawbar HP of the tractor is increased for a given hauling distance (ii) Decreased if drawbar HP of the tractor is increased for a given hauling distance (iii) Increased if the hauling distance is increased for a given drawbar HP of the tractor (iv) Decreased if the hauling distance is increased for a given drawbar HP of thetractor Of these statement

A. (i) and (iii) are correct
B. (i) and (iv) are correct
C. (ii) and (iii) are correct
D. (ii) and (iv) are correct
Answer» C. (ii) and (iii) are correct