1. |
............. has 3 roles ;Trainer,Motivator and Facilitator |
A. | HRD manager |
B. | Junior engineer |
C. | Public relation officer |
D. | Supervisor |
Answer» E. | |
2. |
Carelessness is the cause of an accident that can be attributed to |
A. | Planning, organization |
B. | Execution of work |
C. | Management |
D. | None of the above |
Answer» E. | |
3. |
The time activity consumes in normal conditions is |
A. | Optimistic time |
B. | Pessimistic time |
C. | Most likely time |
D. | All of the above |
Answer» D. All of the above | |
4. |
Profit sharing bonus |
A. | Direct financial incentive |
B. | Non financial incentive |
C. | Indirect financial incentive |
D. | None of the above |
Answer» B. Non financial incentive | |
5. |
An activity is represented by |
A. | An arrow |
B. | Circle |
C. | Triangle |
D. | None of the above |
Answer» B. Circle | |
6. |
System means |
A. | Group of various units |
B. | Team of clever people |
C. | Method of construction |
D. | Goal of organization |
Answer» B. Team of clever people | |
7. |
The construction of residential building are treated as |
A. | light construction |
B. | heavy construction |
C. | industrial construction |
D. | none of these |
Answer» B. heavy construction | |
8. |
The time activity consumes in most adverse conditions is |
A. | Optimistic time |
B. | Pessimistic time |
C. | Most likely time |
D. | All of the above |
Answer» C. Most likely time | |
9. |
Management consists of .................................. levels. |
A. | Top and bottom level |
B. | Higher and lower level |
C. | Three levels-top level, middle level and lower level. |
D. | Six |
Answer» D. Six | |
10. |
Stock account is cleared yearly while tools and plants account is cleared half yearly |
A. | TRUE |
B. | FALSE |
C. | none |
D. | all |
Answer» C. none | |
11. |
In any construction project the material cost constitute about..... % of the total project cost. |
A. | 60 |
B. | 25 |
C. | 35 |
D. | 45 |
Answer» B. 25 | |
12. |
Moving parts of all equipment should be |
A. | Removed |
B. | Provided with safety guards. |
C. | Replaced with stationary parts |
D. | None of the above |
Answer» C. Replaced with stationary parts | |
13. |
How many envelops are required to submitted Tender form |
A. | 3 |
B. | 1 |
C. | 4 |
D. | 2 |
Answer» D. 2 | |
14. |
Economical aspects of labour welfare includes |
A. | High wages, bonus, medical aid, |
B. | Educational facilities, training, reading room, club |
C. | Transportation |
D. | None of the above |
Answer» B. Educational facilities, training, reading room, club | |
15. |
Who will draft contract agreement? |
A. | Chief engineer |
B. | Divisional head clerk |
C. | Executive engineer |
D. | None of the above |
Answer» C. Executive engineer | |
16. |
In one stack not more than.......... cement bags should be stored one above other. |
A. | 8 |
B. | 10 |
C. | 15 |
D. | 12 |
Answer» E. | |
17. |
Who plays a crucial role in convincing the operating staff to adopt the change? |
A. | HRD manager |
B. | Junior engineer |
C. | Public relation officer |
D. | Supervisor |
Answer» E. | |
18. |
In which of the following stages specifications are prepared? |
A. | Planning stage |
B. | Briefing stage |
C. | Construction stage |
D. | None of the above |
Answer» B. Briefing stage | |
19. |
Care for male employees and justice for female and child worker can create positive attitude |
A. | Right |
B. | Wrong |
C. | none |
D. | all |
Answer» C. none | |
20. |
....................... is an important element of group activities. |
A. | Management |
B. | Construction team |
C. | Team effort |
D. | None of the above |
Answer» B. Construction team | |
21. |
Bar chart is very popular because |
A. | It is very simple |
B. | Each activity is shown separately |
C. | Modification is easy |
D. | All of the above |
Answer» B. Each activity is shown separately | |
22. |
An activity requires |
A. | Events |
B. | Time and resources |
C. | Resources |
D. | Energy |
Answer» C. Resources | |
23. |
HRD is mainly concerned with |
A. | Optimum stress |
B. | Optimum cost |
C. | Optimum duration |
D. | None of the above |
Answer» B. Optimum cost | |
24. |
The stack height for flooring tiles should not be more than........ m. |
A. | 1.5 |
B. | 2.0 |
C. | 1.0 |
D. | 1.75 |
Answer» D. 1.75 | |
25. |
Who should be allowed to go below slab when centering is in position and concreting of slab isgoing on |
A. | Only head carpenter |
B. | Every worker |
C. | Nobody |
D. | Only safety officer |
Answer» D. Only safety officer | |
26. |
A good safety record can produce higher morale, productivity and stronger employee loyalty. |
A. | Right |
B. | Wrong |
C. | none |
D. | all |
Answer» B. Wrong | |
27. |
Road is the example of |
A. | Building constructions. |
B. | Infrastructure construction. |
C. | Industrial construction. |
D. | Special purpose projects |
Answer» C. Industrial construction. | |
28. |
Ladder leading to landing should be extended at least ....... meter above the landing |
A. | 1.2 |
B. | 1.5 |
C. | 1 |
D. | 1.8 |
Answer» D. 1.8 | |
29. |
Wages of worker is liability of |
A. | Engineer |
B. | Government |
C. | Employer |
D. | NGO |
Answer» D. NGO | |
30. |
Labor is perishable resource |
A. | Agree |
B. | Disagree |
C. | none |
D. | all |
Answer» B. Disagree | |
31. |
In which of the following contract; contractor is not required to deposit SD? |
A. | Item rate contract |
B. | Lump sum contract |
C. | Piece work agreement |
D. | Labour contract |
Answer» D. Labour contract | |
32. |
Extra items will cause headache in item rate contract |
A. | Right |
B. | Wrong |
C. | none |
D. | all |
Answer» B. Wrong | |
33. |
There are as many possible causes of accidents as there are occasions |
A. | TRUE |
B. | FALSE |
C. | none |
D. | all |
Answer» B. FALSE | |
34. |
Which of the following organization is widely used in PWD |
A. | Matrix organization |
B. | Line or military organization |
C. | Line and staff organization |
D. | Functional organization |
Answer» D. Functional organization | |
35. |
For repair works at high level of multistoreyed buildings needle scaffolding is preferred |
A. | As it is more stable |
B. | As it looks better |
C. | As it will not obstruct traffic at ground level. |
D. | None of the above |
Answer» D. None of the above | |
36. |
Which of the following is not role of owner |
A. | To arrange fund |
B. | To arrange land |
C. | To ensure quality of construction |
D. | To arrange necessary approvals |
Answer» D. To arrange necessary approvals | |
37. |
In which of the following contract; contractor is required to offer a fixed sum for job in allrespect as per given drawings and details? |
A. | Item rate contract |
B. | Lump-sum contract |
C. | All in one contract |
D. | Labor contract |
Answer» C. All in one contract | |
38. |
Supervisor is at the lowest level of management |
A. | Right |
B. | Wrong |
C. | none |
D. | all |
Answer» B. Wrong | |
39. |
The main function of MIS is to deal with government |
A. | Right |
B. | Wrong |
C. | none |
D. | all |
Answer» C. none | |
40. |
A construction team includes |
A. | owner |
B. | engineer |
C. | architect |
D. | all of these |
Answer» E. | |
41. |
Actual performance of a task is known as |
A. | An event |
B. | An activity |
C. | A duration |
D. | None of the above |
Answer» C. A duration | |
42. |
The construction of airports are treated as |
A. | light construction |
B. | heavy construction |
C. | industrial construction |
D. | none of these |
Answer» C. industrial construction | |
43. |
The field of activities of an engineer includes |
A. | estimation |
B. | approval of construction plans by the local authority |
C. | inspection and payment of work done by contractor |
D. | all of above |
Answer» E. | |
44. |
Better working conditions |
A. | Direct financial incentive |
B. | Non financial incentive |
C. | Indirect financial incentive |
D. | None of the above |
Answer» C. Indirect financial incentive | |
45. |
What SMB stands for? |
A. | Short measurement book |
B. | Salient measurement book |
C. | Standard measurement book |
D. | None of the above |
Answer» D. None of the above | |
46. |
Outputs of management control level is |
A. | Goals and policies |
B. | Actions |
C. | Decisions and personal leadership |
D. | None of the above |
Answer» D. None of the above | |
47. |
Who will sign the contract deed on behalf of government |
A. | Chief engineer |
B. | Superintendent engineer |
C. | Executive engineer |
D. | Head clerk |
Answer» D. Head clerk | |
48. |
Operational control is responsibility of |
A. | Head of department |
B. | Top management |
C. | Supervisor,foreman,clerk |
D. | MIS |
Answer» D. MIS | |
49. |
In which of the following contract; contractor is quickly be agreed and work on job? |
A. | Cost plus percentage rate contract |
B. | Lump sum contract |
C. | Piece work agreement |
D. | Labour contract |
Answer» B. Lump sum contract | |
50. |
If work of piling is to be carried out at night, minimum........... 'lux luminance lights should beused. |
A. | 60 |
B. | 200 |
C. | 150 |
D. | 100 |
Answer» E. | |