MCQOPTIONS
Saved Bookmarks
| 1. |
The critical path is |
| A. | The longest path of the network |
| B. | The shortest path of the network |
| C. | The average duration path of the network |
| D. | None of the above |
| Answer» B. The shortest path of the network | |