MCQOPTIONS
Saved Bookmarks
This section includes 14 Mcqs, each offering curated multiple-choice questions to sharpen your Surveying knowledge and support exam preparation. Choose a topic below to get started.
1. |
An offset is laid out 2° from its true direction on the field. If the scale of plotting is 10 m to 1 cm, find the maximum length of the offset so that the displacement of the point on the paper may not exceed 0.25 mm? |
A. | 7.10 m |
B. | 7.16 m |
C. | 7.11 m |
D. | 7.14 m |
Answer» C. 7.11 m | |
2. |
The work in running a survey line is ____________ fold. |
A. | one |
B. | two |
C. | three |
D. | four |
Answer» C. three | |
3. |
Whenever possible, a survey station must be fixed with reference to a minimum ____ number of permanent objects. |
A. | 1 |
B. | 2 |
C. | 3 |
D. | 4 |
Answer» C. 3 | |
4. |
Which of the following details need not be given at the beginning of a particular chain survey lines? |
A. | Name of the line |
B. | Name of the station marked |
C. | Bearing of the line |
D. | Length of line |
Answer» E. | |
5. |
The chain line may be represented either by a single line or by two lines spaced about ____ to _____ cm apart. |
A. | 1.5 to 2 |
B. | 2 to 3 |
C. | 1.5 to 2.5 |
D. | 2.5 to 3.5 |
Answer» B. 2 to 3 | |
6. |
AN_OFFSET_IS_LAID_OUT_2¬¨ àû_FROM_ITS_TRUE_DIRECTION_ON_THE_FIELD._IF_THE_SCALE_OF_PLOTTING_IS_10_M_TO_1_CM,_FIND_THE_MAXIMUM_LENGTH_OF_THE_OFFSET_SO_THAT_THE_DISPLACEMENT_OF_THE_POINT_ON_THE_PAPER_MAY_NOT_EXCEED_0.25_MM??$# |
A. | 7.10 m |
B. | 7.16 m |
C. | 7.11 m |
D. | 7.14 m |
Answer» C. 7.11 m | |
7. |
THE_WORK_IN_RUNNING_A_SURVEY_LINE_IS______________FOLD.?$ |
A. | one |
B. | two |
C. | three |
D. | four |
Answer» C. three | |
8. |
Whenever possible, a survey station must be fixed with reference to a minimum ____ number of permanent objects? |
A. | 1 |
B. | 2 |
C. | 3 |
D. | 4 |
Answer» C. 3 | |
9. |
At what step of chain surveying surveyor should investigate various difficulties that may arise and think of their solution? |
A. | Before selecting survey stations |
B. | after selecting survey stations |
C. | During reconnaissance |
D. | After marking survey stations |
Answer» B. after selecting survey stations | |
10. |
Which of the following details need not be given at the beginning of a particular chain survey? |
A. | Date of survey |
B. | Names of surveyors |
C. | Details of survey lines |
D. | Type of soil |
Answer» E. | |
11. |
The chain line may be represented either by a single line or by two lines spaced about ____ to _____ cm apart. |
A. | 1.5 to 2 |
B. | 2 to 3 |
C. | 1.5 to 2.5 |
D. | 2.5 to 3.5 |
Answer» B. 2 to 3 | |
12. |
What is the size of a field book? |
A. | 20 cm x 20 cm |
B. | 25 cm x 20 cm |
C. | 20 cm x 25 cm |
D. | 25 cm x 25 cm |
Answer» B. 25 cm x 20 cm | |
13. |
The book in which the chain or tape measurements are entered is called the _______ |
A. | Assistant book |
B. | Surveyor book |
C. | Field book |
D. | Survey book |
Answer» D. Survey book | |
14. |
What is the prominent point on the chain line and can be either at the beginning of the chain line or at the end? |
A. | Subsidiary station |
B. | Surveyor station |
C. | Main station |
D. | Tie stations |
Answer» D. Tie stations | |