				This section includes 19 Mcqs, each offering curated multiple-choice questions to sharpen your Highway Engineering knowledge and support exam preparation. Choose a topic below to get started.
| 1. | The thickness of the pitching done by stone masonry to avoid erosion due to water is? | 
| A. | 0.1 m | 
| B. | 0.3 m | 
| C. | 1.0 m | 
| D. | 1.5 m | 
| Answer» C. 1.0 m | |
| 2. | The foundation bed is provided with a downward slope of __________ towards the hill side. | 
| A. | 1 in 6 | 
| B. | 1 in 5 | 
| C. | 1 in 3 | 
| D. | 1 in 1 | 
| Answer» B. 1 in 5 | |
| 3. | The width of the retaining wall foundation is taken as __________ | 
| A. | 0.4h+0.3 m | 
| B. | 0.3h+0.3 m | 
| C. | 0.2h+0.3 m | 
| D. | 0.1h+ 0.3 m | 
| Answer» B. 0.3h+0.3 m | |
| 4. | The typical retaining wall is less than __________ | 
| A. | 6 m | 
| B. | 5 m | 
| C. | 4 m | 
| D. | 3 m | 
| Answer» B. 5 m | |
| 5. | The general minimum width adopted for the retaining wall is __________ | 
| A. | 0.3 m | 
| B. | 0.45 m | 
| C. | 0.6 m | 
| D. | 0.9 m | 
| Answer» C. 0.6 m | |
| 6. | The best type of material for retaining wall is __________ | 
| A. | Concrete | 
| B. | Brick masonry | 
| C. | Stone masonry | 
| D. | Composite | 
| Answer» D. Composite | |
| 7. | What is the most important structure in a hill road? | 
| A. | Retaining wall | 
| B. | Pavement | 
| C. | Drainage | 
| D. | Security force | 
| Answer» B. Pavement | |
| 8. | Where there is insufficient time for blasting the alternative method is? | 
| A. | Cliff gallery | 
| B. | Cradles | 
| C. | Excavation | 
| D. | Both cliff gallery and cradle | 
| Answer» E. | |
| 9. | The number of steps involved in the construction of hill roads are __________ | 
| A. | One | 
| B. | Two | 
| C. | Three | 
| D. | Four | 
| Answer» E. | |
| 10. | THE_FOUNDATION_BED_IS_PROVIDED_WITH_A_DOWNWARD_SLOPE_OF____TOWARDS_THE_HILL_SIDE.?$ | 
| A. | 1 in 6 | 
| B. | 1 in 5 | 
| C. | 1 in 3 | 
| D. | 1 in 1 | 
| Answer» B. 1 in 5 | |
| 11. | The_thickness_of_the_pitching_done_by_stone_masonry_to_avoid_erosion_due_to_water_is.$ | 
| A. | 0.1 m | 
| B. | 0.3 m | 
| C. | 1.0 m | 
| D. | 1.5 m | 
| Answer» C. 1.0 m | |
| 12. | The width of the retaining wall foundation is taken as? | 
| A. | 0.4h+0.3 m | 
| B. | 0.3h+0.3 m | 
| C. | 0.2h+0.3 m | 
| D. | 0.1h+ 0.3 m | 
| Answer» B. 0.3h+0.3 m | |
| 13. | The typical retaining wall is less than. | 
| A. | 6 m | 
| B. | 5 m | 
| C. | 4 m | 
| D. | 3 m | 
| Answer» B. 5 m | |
| 14. | The general minimum width adopted for the retaining wall is. | 
| A. | 0.3 m | 
| B. | 0.45 m | 
| C. | 0.6 m | 
| D. | 0.9 m | 
| Answer» C. 0.6 m | |
| 15. | The best type of material for retaining wall is. | 
| A. | Concrete | 
| B. | Brick masonry | 
| C. | Stone masonry | 
| D. | Composite | 
| Answer» D. Composite | |
| 16. | The most important structure in a hill road is. | 
| A. | Retaining wall | 
| B. | Pavement | 
| C. | Drainage | 
| D. | Security force | 
| Answer» B. Pavement | |
| 17. | Where there is insufficient time for blasting the alternative method is. | 
| A. | Cliff gallery | 
| B. | Cradles | 
| C. | Excavation | 
| D. | Both cliff gallery and cradle | 
| Answer» E. | |
| 18. | The hard rock is permitted to over hang the road forming a. | 
| A. | Half tunnel | 
| B. | Full tunnel | 
| C. | 3/4 tunnel | 
| D. | 1/4 tunnel | 
| Answer» B. Full tunnel | |
| 19. | The number of steps involved in the construction of hill roads are. | 
| A. | One | 
| B. | Two | 
| C. | Three | 
| D. | Four | 
| Answer» E. | |