This section includes 14 Mcqs, each offering curated multiple-choice questions to sharpen your Highway Engineering knowledge and support exam preparation. Choose a topic below to get started.
| 1. |
The absolute minimum radius of the curve in snow bound area is __________ |
| A. | 60 m |
| B. | 70 m |
| C. | 80 m |
| D. | 90 m |
| Answer» B. 70 m | |
| 2. |
The minimum sufficient straight distance between the transitional ends for reverse curves is __________ |
| A. | 3.0 m |
| B. | 5.0 m |
| C. | 9.0 m |
| D. | 12.0 m |
| Answer» D. 12.0 m | |
| 3. |
What is the maximum super elevation on snow bound area? |
| A. | 3.0% |
| B. | 5.0% |
| C. | 7.0% |
| D. | 10.0% |
| Answer» D. 10.0% | |
| 4. |
What is the intermediate sight distance for a speed limit of 50 Kmph? |
| A. | 120 m |
| B. | 60 m |
| C. | 40 m |
| D. | 30 m |
| Answer» B. 60 m | |
| 5. |
What is the stopping sight distance for a speed limit of 50 Kmph? |
| A. | 30 m |
| B. | 40 m |
| C. | 60 m |
| D. | 120 m |
| Answer» D. 120 m | |
| 6. |
The camber for the earth roads should be never less than __________ |
| A. | 4% |
| B. | 3.75% |
| C. | 3.5% |
| D. | 3.0% |
| Answer» E. | |
| 7. |
The flatter camber may be provided if the road has a longitudinal gradient greater than __________ |
| A. | 1 in 40 |
| B. | 1 in 35 |
| C. | 1 in 30 |
| D. | 1 in 20 |
| Answer» E. | |
| 8. |
The pavement width for a single lane road on a hill is __________ |
| A. | 3.5 m |
| B. | 3.75 m |
| C. | 7.0 m |
| D. | 7.5 m |
| Answer» E. | |
| 9. |
What is the minimum right of way distance in exceptional cases? |
| A. | 7 m |
| B. | 5 m |
| C. | 3 m |
| D. | 4 m |
| Answer» D. 4 m | |
| 10. |
What is the speed limit on the national highway on hill road in Kmph? |
| A. | 60 |
| B. | 50 |
| C. | 40 |
| D. | 30 |
| Answer» C. 40 | |
| 11. |
What is the strip length to be surveyed on the straight alignment? |
| A. | 5 m |
| B. | 10 m |
| C. | 15 m |
| D. | 30 m |
| Answer» D. 30 m | |
| 12. |
The bench marks are fixed during the __________ |
| A. | Preliminary survey |
| B. | Reconnaissance |
| C. | Detailed survey |
| D. | After detailed project report |
| Answer» D. After detailed project report | |
| 13. |
The general route for alignment is selected during __________ |
| A. | Reconnaissance |
| B. | Trace cut |
| C. | Detailed survey |
| D. | Detailed project report |
| Answer» B. Trace cut | |
| 14. |
The alignment of hill roads is divided into how many stages? |
| A. | One |
| B. | Two |
| C. | Three |
| D. | Four |
| Answer» D. Four | |