MCQOPTIONS
Saved Bookmarks
| 1. |
Which of these is used when the process has achieved high capability level? |
| A. | Trial control limits |
| B. | Actual control limits |
| C. | Modified control limits |
| D. | Easy control limits |
| Answer» D. Easy control limits | |