MCQOPTIONS
Saved Bookmarks
| 1. |
Which of the following work is not performed by canal headwork |
| A. | To control the silting in canal |
| B. | To raise the water level of river water |
| C. | To control the flow in the existing canal |
| D. | To generate the electricity power from water |
| Answer» E. | |