MCQOPTIONS
Saved Bookmarks
| 1. |
Which of the following statements is true regarding the construction of cycle track in Mumbai? The cycle track will be built by clearing all the encroachments along water pipelines in Mumbai, which will open 100-metre wide corridor on both the sides.nThis is a 300 crore project, which will create the shortest route connect between North-South and East-West Mumbai. It will have 40 entry/exit points and will connect to 19 railway station, seven Metro rail stations and four Monorail stations. |
| A. | Only I |
| B. | Only II |
| C. | Both I and II |
| D. | Neither I nor II |
| Answer» D. Neither I nor II | |