MCQOPTIONS
Saved Bookmarks
| 1. |
Which of the following scheduler is in charge of handling the swapped out process ? |
| A. | Short term |
| B. | Medium term |
| C. | Long term |
| D. | Both (A) and (B) |
| Answer» C. Long term | |