MCQOPTIONS
Saved Bookmarks
| 1. |
Which of the following is/are true for the Narmada Main Canal of Sardar Sarovar Project?(i) Narmada Main Canal is a contour canal.(ii) It is the largest lined irrigation canal in the world.(iii) It has a capacity to flow 40000 cusecs at its head. |
| A. | Only (i) |
| B. | (i) and (ii) |
| C. | (i) and (iii) |
| D. | (i), (ii) and (iii) |
| Answer» E. | |