MCQOPTIONS
Saved Bookmarks
| 1. |
Which of the following control system involves the control of pathway after the branch point to the product? |
| A. | Concerted |
| B. | Cooperative |
| C. | Cumulative |
| D. | Sequential |
| Answer» E. | |