Which formula gives the amount of cement required for soil stabilization if other parameters are given? |
| A. | \((\frac{AHr_d}{100})\times(\frac{p}{100+p})\) |
| B. | \((\frac{AHr_d}{100})\times(\frac{p}{100-p})\) |
| C. | \((\frac{AHr_d}{100-p})\times(\frac{p}{100+p})\) |
| D. | \((\frac{AHr_d}{100})\times(\frac{p}{100})\) |
| Answer» B. \((\frac{AHr_d}{100})\times(\frac{p}{100-p})\) | |