MCQOPTIONS
Saved Bookmarks
| 1. |
Vienna developed the method of wire bound reinforced concrete pipe by binding high tensile steel wires, the stresses in that were ranging in between ___________ |
| A. | 170 to 900 |
| B. | 100 to 800 |
| C. | 160 to 800 |
| D. | 140 to 200 |
| Answer» D. 140 to 200 | |