1.

Two turbo-generators, each of capacity 25,000 kW, have been installed at a hydel power station. The load on the hydel plant varies from 15,000 kW to 40,000 kW. The total installed plant capacity and the load factor are nearly

A. 40,000 kW and 68.8%
B. 50,000 kW and 68.8%
C. 40,000 kW and 62.3%
D. 50,000 kW and 62.3%
Answer» C. 40,000 kW and 62.3%