There are two stages involved in the construction ..
1.
There are two stages involved in the construction of a new road.
A.
True
B.
False
Answer» B. False
Show Answer
Discussion
No Comment Found
Post Comment
Related MCQs
The preliminary investigation does not include which of the below options?
What are the critical parameters used in the pavement design to limit rutting and cracking?
It is necessary that the rigid pavement rests on a non-rigid surface.
Which of the below is not a secondary factor to be considered for the pavement design process?
What grade of bitumen must be used for the construction in a hot climatic condition?
What is the structural analysis of flexible pavement using IIT Pave based on?
What is the formula used for the computation of design traffic?
The characteristics of concrete used in the pavement design should be according to which code?
There are two stages involved in the construction of a new road.
Which software can be used for the structural analysis of the pavement?
Reply to Comment
×
Name
*
Email
*
Comment
*
Submit Reply