1.

The work done by a man in lifting an object of mass 5 kg to a height 50 cm from the ground level is ( g = 10 ms -2) ___________.

A. 25 N
B. 2500 J
C. 25 J
D. 2.5 J
Answer» D. 2.5 J


Discussion

No Comment Found