The time study of machinery operation recorded a cycle time of 7.0, 6.0, 7.0, 8.0 minutes. The performance rating of worker is 95%. The allowance fraction is 0.1. Standard time will be given by: |
| A. | 15.65 minutes |
| B. | 7.39 minutes |
| C. | 4.66 minutes |
| D. | 2.87 minutes |
| Answer» C. 4.66 minutes | |