1.

The slope of a 1.0 m diameter concrete sewer laid at a slope of 1 in 1000, develops a velocity of 1 m/s when flowing full. When it is flowing half-full, the velocity of flow through the sewer will be:

A. 0.5 m/s
B. 1.0 m/s
C. 2.0m/s
D. 4.0 m/s
Answer» C. 2.0m/s


Discussion

No Comment Found