1.

The nominal lead and lift allowed for the earthwork in the excavations of the foundations are:

A. 50 m and 2 m
B. 30 m and 2 m
C. 30 m and 1.5 m
D. 20 m and 1 m
Answer» D. 20 m and 1 m