				| 1. | 
                                    The group index of the soil is found to be 5 and the traffic condition expected is medium traffic. What would be the combined thickness to be provided on the pavement for bearing the loads to ensure smooth conduct of traffic. | 
                            
| A. | 24 cm | 
| B. | 38 cm | 
| C. | 34 cm | 
| D. | 28 cm | 
| Answer» D. 28 cm | |