MCQOPTIONS
Saved Bookmarks
| 1. |
The following details pertain to the crossing of a canal with a natural drain.Full supply level in canal = RL 213.5 mBed level of canal = RL 212 mHigh flood level in drain = RL 210 mConsidering the given details, which type of cross drainage work is best suited to the site? |
| A. | Aqueduct |
| B. | Super passage |
| C. | Syphon aqueduct |
| D. | Syphon |
| Answer» B. Super passage | |