MCQOPTIONS
Saved Bookmarks
| 1. |
The design flood commonly adopted in India for spillways of major projects is the: |
| A. | Standard Project Flood |
| B. | Flood with a Return Period of 100 years |
| C. | Probable Maximum Flood |
| D. | Flood with a Return Period of 10,000 years |
| Answer» D. Flood with a Return Period of 10,000 years | |