MCQOPTIONS
Bookmark
Saved Bookmarks
→
Prestressed Concrete Structures
→
Transmission Length
→
The Composite construction was first tries for a m..
1.
The Composite construction was first tries for a motorway bridge?
A.
1940
B.
1945
C.
1960
D.
1980
Answer» B. 1945
Show Answer
Discussion
No Comment Found
Post Comment
Related MCQs
To attain the composite action the precast stem and the flange is ____________
The main components of the composite beam are prestressed precast stem and ____________
The combination of light weight concrete for the cast insitu slab results in reduced ____________
The efficient utilization of material in a composite section in which the low and medium strength concrete resists?
In many cases precast prestressed unit serve as ____________
Due to the effect of composite action sizes of precast prestressed units can be ______________
The Composite construction was first tries for a motorway bridge?
The composite sections provide one monolithic action between ______________
Reply to Comment
×
Name
*
Email
*
Comment
*
Submit Reply