1.
The aim of quality control is to prevent the defect.
A.
True
B.
False
Answer» C.
Show Answer
Discussion
No Comment Found
Post Comment
Related MCQs
The allowable tolerance of horizontal alignment for carriageway edges is 25 mm.
The checking of the transverse profile of the pavement is done with the help of ______
What is the frequency of conducting the test for the quality of binder in the case of a bituminous penetration macadam?
The testing of parameters should be done in the proportion as ______ by the junior engineer, ______ by the executive engineer and ______ by the chief executive engineer.
Table 3.3 in IRC:SP:11-1984 gives the summary of control tests for ______
The aim of quality control is to prevent the defect.
What does the code IRC:SP:57-2000 deal with?
IRC:43-1972 is referred to for quality control guidelines regarding which topic below?