Standard Project Flood for the drainage area involved is the flood that |
| A. | is sure to be equalled in magnitude once or more time in the estimated life of the project |
| B. | is likely to be exceeded in magnitude only at rare occasions in the estimated life of the project |
| C. | might occur under the worst meteorological and hydrological conditions in the estimated life of the project |
| D. | will occur under standard meteorological conditions in the estimated life of the project |
| Answer» C. might occur under the worst meteorological and hydrological conditions in the estimated life of the project | |