ST and NT denote the standard time and the normal time, respectively, to complete a job. Allowance = LL × ST, where 0 < LL < 1. Which one of the following relationships is correct? |
| A. | ST = \(\frac{NT }{(1-LL)}\) |
| B. | ST = NT (1 + LL) |
| C. | ST = \(\frac{NT}{(1+LL)}\) |
| D. | ST = NT (1 - LL) |
| Answer» B. ST = NT (1 + LL) | |