Statistical Quality Control
→
Process Capability Analysis Using Histogram Probability Plot
→
Runs tests can be applied on the GCC.
1.
Runs tests can be applied on the GCC.
A.
True
B.
False
Answer» C.
Show Answer
Discussion
No Comment Found
Post Comment
Related MCQs
EACH_PLOTTED_POINT_ON_THE_GCC_IS_IDENTIFIED_BY____?$
_____RANGE_WILL_BE_PLOTTED_ON_THE_R_CHART_OF_THE_GCC.?$
A MSP is out of control if a point on the GCC exceeds _______$
If the number of times a particular stream gives the maximum value of average or range for the GCC, increases, the value of one sided in-control ARL for that event will increase.
Runs tests can be applied on the GCC.
If there are 6 streams of a MSP, and one of the streams has given 4 consecutive times the largest value, what will be the value of the one sided in-control ARL for this event?
In GCC we plot ___ means observed at any time period?
When the subgroup size is 4 for any process samples, what will be the value of the R chart LCL of the GCC?
What will be the value of the LCL of the x chart of the GCC when the value of x =12, and the value of RÃÖ= 0.1 and sample size = 4?$
If the sample size is 4, what will be the value of the upper control limit of the GCC R chart?