MCQOPTIONS
Saved Bookmarks
| 1. |
P.M.T.S( Predetermined Motion Time System) includ? |
| A. | M.T.M (Method Time Measurement) |
| B. | W.F.S (Work Factor Systems) |
| C. | B.M.T.S (Basic Motion Time Study) |
| D. | All of the mentioned |
| Answer» E. | |