

MCQOPTIONS
Saved Bookmarks
1. |
Overheads can be absorbed into cost units by means of:• Physical unit produced • Percentage of prime cost • Percentage of direct wages • Direct labour hour rate • Machine hour rate |
A. | All of the above |
B. | (I) (IV) and (V) only |
C. | (IV) and (V) only |
D. | None |
Answer» B. (I) (IV) and (V) only | |