| 1. |
On a project, quality should generally be of |
| A. | equal priority with cost and schedule |
| B. | lower priority than cost and schedule |
| C. | equal priority with cost, but higher priority than schedule |
| D. | equal priority with schedule, but higher priority than cost |
| Answer» B. lower priority than cost and schedule | |