MNRE issued guidelines for setting up wind power projects of how many MW linked to ISTS scheme? |
| A. | 1000 MW |
| B. | 10000 MW |
| C. | 20000 MW |
| D. | 30000 MW |
| Answer» B. 10000 MW | |