MCQOPTIONS
Bookmark
Saved Bookmarks
→
Statistical Quality Control
→
Process Capability Analysis Using Histogram Probability Plot
→
Low type I error probability is obtained when 2-si...
1.
Low type I error probability is obtained when 2-sigma limits are used for modified control chart.
A.
True
B.
False
Answer» C.
Show Answer
Discussion
No Comment Found
Post Comment
Related MCQs
It is impossible to get desired values of , , , and in the acceptance control charts.
Low type I error probability is obtained when 2-sigma limits are used for modified control chart.
2-sigma limits are recommended for the modified control charts. Which of these is not one of the reasons for this?
Modified control chart design is not based upon ____________
if = 0.01, =0.00135, =0.05, and =0.2, what will be the sample size for the desired values of these?
What is the expression for n which gives desired values of , , , and for any acceptance control chart?
When the values of and are specified instead of the and , what is the position of UCL of the acceptance control charts?
When the values of n, , and , are specified, the LCL of the acceptance control charts, lie in between ________
When n, , and are specified, the values of control limits are between ________
What is the value of the LCL of the acceptance control chart when sample size n and the fraction nonconforming for 1- probability of rejection are specified?
Reply to Comment
×
Name
*
Email
*
Comment
*
Submit Reply
Your experience on this site will be improved by allowing cookies. Read
Cookie Policy
Reject
Allow cookies