MCQOPTIONS
Bookmark
Saved Bookmarks
→
Pavement Design
→
Bituminous Material Tests 1 in Pavement Design
→
Longer curing periods are found to decrease the s..
1.
Longer curing periods are found to decrease the strength of the soil-bitumen mix.
A.
True
B.
False
Answer» C.
Show Answer
Discussion
No Comment Found
Post Comment
Related MCQs
which field control test is conducted after compaction?
Aeration is provided to ensure that the soil mixture can be ______ easily.
Foamed bitumen can be used for the stabilization of soil.
Which of the below is not a process involved in the construction of soil-bitumen?
What is the main principle behind stabilizing cohesive soil using bitumen?
Longer curing periods are found to decrease the strength of the soil-bitumen mix.
What is the limit of plasticity index for a soil to be stabilized by bitumen?
Which type of asphalt is commonly used in the soil stabilization process?
What are the basic principles involved in the soil-bitumen stabilization?
What is the content of bitumen allowed in sands?
Reply to Comment
×
Name
*
Email
*
Comment
*
Submit Reply