Pavement Design
→
Bituminous Material Tests 1 in Pavement Design
→
It is necessary to maintain the water-cement rati..
1.
It is necessary to maintain the water-cement ratio in the cement stabilization.
A.
True
B.
False
Answer» C.
Show Answer
Discussion
No Comment Found
Post Comment
Related MCQs
What is the British method of the mix design of the soil-cement mix based on?
The percentage of soil particles passing 4.75 mm sieve must be ______ to be used in soil-cement.
Which formula gives the amount of cement required for soil stabilization if other parameters are given?
It is necessary to maintain the water-cement ratio in the cement stabilization.
By what mechanism does the cement stabilization take place in granular soils?
Which of the below type of soil cement contains less amount of cement?
Which of the below soil type and the amount of cement required pairs has been matched correctly?
Soil cement cannot be used as a surface course.
Cement stabilization cannot be used in which of the below soil types?
Which of the below is not an additive used to improve the properties of soil cement?
Reply to Comment
×
Name
*
Email
*
Comment
*
Submit Reply