MCQOPTIONS
Saved Bookmarks
| 1. |
In cold mix type bituminous construction, what is the temperature of the aggregates used for the mixing? |
| A. | 10 C |
| B. | 106 C |
| C. | Atmospheric temperature |
| D. | Apparent temperature |
| Answer» D. Apparent temperature | |