MCQOPTIONS
Saved Bookmarks
| 1. |
in a process costing system, manufacturing overhead is assigned to work in process by |
| A. | Department based on actual overhead costs incurred |
| B. | Department based on predetermined overhead rates |
| C. | Job based on actual overhead costs incurred |
| D. | Job based on predetermined overhead rates |
| Answer» C. Job based on actual overhead costs incurred | |