MCQOPTIONS
 Saved Bookmarks
				| 1. | 
                                    If the soil available for construction of subgrade is weak, then which one of the following can be used? | 
                            
| A. | Increasing thickness | 
| B. | Providing additional silt | 
| C. | Additional base layers | 
| D. | Dehydrate the soil | 
| Answer» D. Dehydrate the soil | |