1.

If the soil available for construction of subgrade is weak, then which one of the following can be used?

A. Increasing thickness
B. Providing additional silt
C. Additional base layers
D. Dehydrate the soil
Answer» D. Dehydrate the soil


Discussion

No Comment Found