

MCQOPTIONS
Saved Bookmarks
1. |
If an actual manufacturing overhead costs is $485000 and actual total quantity of cost allocation base is 4500 labor hours, then the overhead rate would be |
A. | 109.87 |
B. | $107.78 |
C. | $106.56 |
D. | $104.34 |
Answer» C. $106.56 | |