MCQOPTIONS
Saved Bookmarks
| 1. |
How to control the structure and timing of the entity can be changed? |
| A. | By using TIME variable in the entity |
| B. | By changing the entity declaration from time to time |
| C. | By using some special code |
| D. | By using GENERICS |
| Answer» E. | |