MCQOPTIONS
Saved Bookmarks
| 1. |
How much Du0026G (Supervision) charges are levied on deposit/BOT works of ROB/RUBs in case of the work is executed by Railway: |
| A. | 12% |
| B. | 13% |
| C. | 11.5% |
| D. | 12.5% |
| Answer» E. | |